Your Total Ground Engineering Partner

Mon - Fri 8:00AM - 5:30PM

Sat and Sun - CLOSED

P.O. Box 856

Abu Dhabi, UAE

Top

Archive

Yas South Integrated Resort

Yas South Integrated Resort

Yas South Integrated Destination Resort (IDR) Phase 2 Marine Works included the construction of a marine pier with precast gravity block quay wall (reclaimed area...

Quay Walls at the Palm Jumeirah

Quay Walls at The Palm Jumeirah

The quay wall and marine works package involved the design and construction of approximately 4.6 km of reinforced concrete diaphragm wall, to a depth of...

Quay Wall at Mina Khalid

Quay Wall at Mina Khalid

Construction of a 500m long tied back sheet piled quay wall, which included the supply and fixing of associated quay furniture (bollards, fenders, mooring rings,...

Mubarraz Island Jetty for ADNOC

Construction of an offshore oilfield jetty founded on marine steel circular piles (140 ton capacity) consisting of a concrete abutment, approach trestle (100m long), jetty...