Your Total Ground Engineering Partner

Sun - Thu 8:00AM - 6:30PM

Fri and Sat - CLOSED

P.O. Box 856

Abu Dhabi, UAE

Top

Safina Project – Ship Launch and Recovery Facility

Marine Works

Located at the Dubai Drydocks complex in Dubai, the design and construction of this ship launch and recovery facility included:

  • 60 m x 140 m transfer platform, supported on bored piles
  • Hydrolift Basin – 65 m x 130 m, surrounded by diaphragm walls to allow excavation of basin floor to -6.50 m CD
  • Transfer platform and outer walls of the basin, surrounded by a reinforced concrete impounding wall to +10.00 m CD
  • Two abutments and a sill (finished at -6.00 m CD) support the seaward gate
  • Sheet pile quay wall and cofferdam
  • Berthing dolphins

View the Project Data Sheet: