Cascade Parking is an underground car parking structure located in the plot of an existing man-made lake. The new Cascade Parking will consist of two basement levels to accommodate 300 parking spaces.
Diaphragm Walls
Perimeter : 244 m
Depth of wall : 18 m – 24 m
Retained height : 12 m – 18 m
Thickness : 1,000 mm
Total length drilled : 1,350 LM
Struts : 21 nos. of 1,000 mm dia. pipes
Shoring Works
780 mm dia. piles : 93 nos.
Concrete volume : 7,098 m3
Reinforcement steel : 398 tons
Demolition, excavation and dewatering works.