Doha Metro Green Line – Al Rayyan/Al Qadeem Station

Doha Metro Green Line – Al Rayyan/Al Qadeem Station

TRANSPORT – RAIL • CONTIGUOUS PILED WALLS • GROUND ANCHORS • ROCK NAILS • SHOTCRETING • WEEP HOLES
Project Details

The Doha Metro Green Line will link Musheireb to the Al Rayyan Stadium. It will have a 16.6 km long twin-bored tunnel built at an average of 20 metres. The Al Rayyan/Al Qadeem station is one of the 8 stations along this line.

Contiguous Piled Wall
Perimeter : 437.5 LM
Retained height : 8.75 m – 26.75 m
Shoring piles : 175 nos.
Pile details : 800 mm dia. @ 2.5 m c/c, 14.5 m long
Total length drilled : 3,926 LM

Ground Anchors
421 nos., 4 strands
163 nos., 5 strands
184 nos., 6 strands
50 nos., 7 strands

Concrete volume : 1,567 m3
Reinforcement steel : 193.5 tons

Shotcreting works : 14,550 m2

Rock nails : 1,120 nos., 25mm dia., 10m long

Weep holes : 928 nos., 3” dia., 10m long

View Project Data Sheet