Client
Consultant
Main Contractor for Enabling Works
Location
Start Date
Completion Date
As main contractor for the enabling works, NSCC’s scope of works includes vibro replacement works via installation of stone columns, relocation & protection of existing utilities, grading works and construction of an access road.
Method : Wet Top Feed
Stone columns : 18,111 nos.
Stone columns diameter : 1,000 mm
Depth : 7 – 15 m
Total linear metre : 151,226 m
Volume : 840,528 cubic metres
Area of treatment : 93,392 m2
Equipment used : 4 nos. Vibroflot B27
The planned theme park will boast 19 themed rides, a hotel and multiplex cinemas, and is part of the expansion of Yas Island as a local and international tourist destination.