Project Details

Rock filling : 69,885 m3
Pre-cast concrete blocks : 1,998 nos.
Pontoons : 933 m2
Pre-cast block quay wall : 361 m
Tubular steel piles : 28 nos., of 600 mm dia.
Excavation/dredging : 21,504 m3
Reclamation : 190,000 m3

Vibro Compaction
Depth of treatment : 11.5 & 12.5 mm
Volume of treatment : 118,607 m3

Yas South Integrated Destination Resort (IDR) Phase 2 Marine Works included the construction of a marine pier with precast gravity block quay wall (reclaimed area – 150m x 65m), floating marina and pontoons for berthing and mooring, cantilevered coping deck to serve as pedestrian walkway and viewing terrace. In addition to the above, other structures included a reclaimed sand box for private bathing, a stepped viewing platform with multi levelled finished levels and a giant sculpture area overlooking the proposed sculpture. Sufficient navigation aids were provided to restrict and/or guide vessels moving around the area.

View Project Data Sheet