Vibro Compaction at Port of Duqm

Vibro Compaction at Port of Duqm

For construction of roads, infrastructure & building works

PORTS • VIBRO COMPACTION
Project Details

Soil improvement of the Commercial Terminal and
operational zones by means of vibro compaction. The
objective of the treatment is to enhance the soil bearing
capacity and mitigate the risk of liquefaction.

Phase 1
Average depth : 18 m
Volume : 8,544,042 m3
Area of treatment : 474,669 m2
Equipment used : 4 nos. of tandem rigs with B42 Vibroflot

Phase 2
Average depth : 18 m
Volume : 3,600,000 m3
Area of treatment : 200,000 m2
Equipment used : 3 nos. of tandem rigs with B42 Vibroflot

View Project Data Sheet