Micropiles Length : 15 m Number of piles : 312 Total length drilled : 4,680 m Cement : 233.5 tons
TAM Grouting Grouting pipes : 582 nos. Pipe length : 3.5 – 4.5 m Total length installed : 2,132 m Cement : 262.6 tons Through the TAM valves 136,609 litres of grout were permeated through the surrounding soil. Area of treatment : 1,832 m<sup)2