NFPC Mega Plant at KIZAD

NFPC Mega Plant at KIZAD

Sector KHIA8, Plot 65, Khalifa Industrial Zone

INDUSTRIAL • CONTINUOUS FLIGHT AUGER (CFA) PILES • RAPID IMPACT COMPACTION (RIC)

Main Piles
750 mm dia. piles : 2,195 nos.
Drilling depth : 6.3 m
Total length drilled : 15,418 LM

Static pile load tests : 43 nos.
Non working load tests : 5 nos.
Integrity tests : 2,195 nos.

Concrete volume : 7,670 m3
Reinforcement steel : 610 tons
Caps excavation volume : 51,000 m3

Rapid Impact Compaction (RIC) : 280,000 m2
Import from borrow pit, spread : 450,000 m3 and level of fill material

This 752,000 sqm mega facility will comprise a 5-gallon water bottling plant, dairy, juice and small water bottling plant, as well as a waste water treatment plant, 10,000 sqm office building, 2,800 sqm central district cooling plant, fully automated packaging factory, recycling plant and an automated cold store.