Due to unsuitable soil conditions for the proposed raft foundation at this site, stone columns ground improvement works were required. NSCC was originally awarded the subcontract for ground improvement works at one plot, and subsequently awarded the project’s remaining 6 plots after superior performance at the first plot.
Stone columns were installed to a depth of around 6.5 m at 2.0 m grid spacing.
Method : Wet Top Feed
Stone columns diameter : 900 mm
Depth : 6.0 – 6.7 m
Total linear meter : 149,000 LM
Surrounded by a large number of well established
residential communities in the heart of Jumeirah, Citywalk is destined to become a vibrant retail destination and prestigious residential development.