Client
Consultant
Main Contractor
Location
Start Date
Completion Date
Rigid Inclusions (RI)
450 mm dia. columns : 3058 nos.
RI column length : 8 – 12.3 m
Grid spacing : 4 m
Total length drilled : 30,583 LM
Concrete volume : 4,864 m3
Vibro Compaction
Depth of treatment : 8.714 & 9.422 m
Grid spacing : 2.5 – 3.5 m
Volume of treatment : 171,707 m3
Continuous Flight Auger (CFA) Piles
750 mm dia. : 397 nos., to a depth of 10 – 12.3 m
900 mm dia. : 4 nos., to a depth of 12.6 m
Total length drilled : 4931.8 LM
Concrete volume : 2,119.9 m3
Reinforcement steel : 124.35 tons
Excavation volume : 32,022 m3
Backfilling : 275,179 m3
