Port of Sokhna Basin

Port of Sokhna Basin

Basin 2 & 3 Extension and Basin 4 & 5

PORTS & SHIPPING • Deep Excavation • Barrettes • Rotary Bored Piles • Diaphragm Wall
Project Details

Diaphragm Wall
Length : 672 m
Depth of wall : 41.6 – 29.6 m
Retained height : 19.6 m
Thickness : 1,200 mm
Concrete volume : 25,881 m3
Reinforcement steel : 6,654.8 tons

Rotary Bored Piles
1200 mm dia. : 452 nos.
Average depth : 43.6 – 29.6 m
Total length drilled : 14,892 LM
Concrete volume : 16,834 m3
Reinforcement steel : 3,139.6 tons

Barrettes
2800 x 800 mm : 151 nos.
Average depth : 40.17 m
Total length drilled : 7,270.6 LM

Concrete volume : 10.537 m3
Reinforcement steel : 2,528 tons

View Project Data Sheet