Client
Consultant
Main Contractor
HDD Contractor
Location
Start Date
Completion Date
Installation of 2130 m of 24” gas pipeline which was welded and laid on the sea bed, and a parallel 225 mm HDPE duct for fibre optic cable (FOC).
Shore approach installation of 550 m 24” gas pipeline & 2 nos. of parallel 450 mm HDPE ducts for power cables.
Rig Type : 350 Ton Drilling RigMarine Equipment : Spud barges, multicats, tugs, speed boats and divers
Headquarters, Abu Dhabi, UAE
E: info@nsccme.com
T: +971 2 697 7000