Bahrain LNG Import Terminal Project – Road Crossings
Installation of 625 m of 24” gas pipeline and a parallel 225 mm HDPE duct for fibre optic cable (FOC). Rig Type : 350 Ton...
Bahrain LNG Import Terminal Project
Installation of 2130 m of 24” gas pipeline which was welded and laid on the sea bed, and a parallel 225 mm HDPE duct for...
Installation of Gas Pipelines for SCOP, Iraq
NSCC International set a new world record with this installation of 48” gas pipeline and parallel 180 mm HDPE pipe for fibre optic cabling underneath...
HDD Pipeline Crossing between Zayed Port and Saadiyat Island
Installation of two bundles, 900 m each, of (3 x 280 mm) + (3 x 125 mm) + (1 x 63 mm) HDPE Pipes PE100...
Umm Al Nar HDD Channel Crossing
Installation of 18” dia. crude oil pipeline....
Samaliah Island HDD Pipeline Crossing
Supply, welding, coating, testing and installation of 24” pipeline from Abu Dhabi mainland to Samaliah Island....