Bahrain LNG Import Terminal Project – Road Crossings
Installation of 625 m of 24” gas pipeline and a parallel 225 mm HDPE duct for fibre optic cable (FOC). Rig Type : 350 Ton...
July 29, 2018
Bahrain LNG Import Terminal Project
Installation of 2130 m of 24” gas pipeline which was welded and laid on the sea bed, and a parallel 225 mm HDPE duct for...
July 29, 2018
Construction of Siphon of Shatt Al-Arab
The project is located in the south of Abu-Floos sea port in Basra and comprises execution of main siphon structure for Shatt Al Arab with...
August 24, 2016