Construction of Siphon of Shatt Al-Arab
The project is located in the south of Abu-Floos sea port in Basra and comprises execution of main siphon structure for Shatt Al Arab with...
August 24, 2016
HDD Pipeline Crossing between Zayed Port and Saadiyat Island
Installation of two bundles, 900 m each, of (3 x 280 mm) + (3 x 125 mm) + (1 x 63 mm) HDPE Pipes PE100...
November 23, 2010
Samaliah Island HDD Pipeline Crossing
Supply, welding, coating, testing and installation of 24” pipeline from Abu Dhabi mainland to Samaliah Island....
August 20, 2001