Vibro Compaction at Port of Duqm
Soil improvement of the Commercial Terminal and operational zones by means of vibro compaction. The objective of the treatment is to enhance the soil bearing...
Port of Duqm Ground Improvement Works
Ground improvement works employing vibro compaction method was carried out at the government berth area at Duqm Port in Oman. The scope of works included...
Doha Metro Green Line – Al Rayyan/C-Ring Station
"The Al Rayyan/C-Ring (The White Palace) Station is the largest station along the Green Line and also serves as an interchange for the Blue Line...
Abu Dhabi International Airport Midfield Terminal Complex
One of the largest piling jobs ever to be seen in the region, the sensitive nature of the structure and challenging rock conditions (due to...
Doha Metro Green Line – Al Rayyan/Al Qadeem Station
The Doha Metro Green Line will link Musheireb to the Al Rayyan Stadium. It will have a 16.6 km long twin-bored tunnel built at an...
Safina Project – Ship Launch and Recovery Facility
Located at the Dubai Drydocks complex in Dubai, the design and construction of this ship launch and recovery facility included....
Foundation of Haramain Railways
The Haramain High Speed Rail project also known as the “Western Railway” or “Mecca-Medina high speed railway”, is a 449.2-km high speed intercity rail transport...
King Abdulaziz International Airport Development Project
Piling and shoring works for the Arterial 4 Tunnel at King Abdulaziz International Airport....
Palm Jumeirah Reinforced Concrete Spine Underpass
The Project involves the building of an open underpass 400 m long with two overhead bridge decks....