One of the largest piling jobs ever to be seen in the region, the sensitive nature of the structure and challenging rock conditions (due to the presence of cavities in relatively soluble rock) had to be carefully considered in our design. The NSCC Team devised methods of probing the rock and locating the cavities in every pile to a depth of 30 meters.