The project is located on the West Island of Upper Zakum (UZ750), Abu Dhabi. The scope of works was to perform a trial at an area of 50m x 50m by one tandem, of various timed intervals by automatic air/water manifold system, for evaluating optimum grid spacing, timed intervals and procedures for the re-compaction work of the compacted island.