Installation of 2130 m of 24” gas pipeline which was welded and laid on the sea bed, and a parallel 225 mm HDPE duct for fibre optic cable (FOC).
Shore approach installation of 550 m 24” gas pipeline & 2 nos. of parallel 450 mm HDPE ducts for power cables.
Rig Type: 350 Ton Drilling Rig
Marine Equipment: Spud barges, multicats, tugs, speed boats and divers