HDD Pipeline Crossing between Zayed Port and Saadiyat Island

Horizontal Directional Drilling (HDD)

Installation of two bundles, 900 m each, of (3 x 280 mm) + (3 x 125 mm) + (1 x 63 mm) HDPE Pipes PE100 SDR9 between Zayed Port and Saadiyat Island.

View the Project Data Sheet:

Client

TRANSCO

Consultant

Lahmeyer International

Main Contractor

Al Barrak Elec. Cont. Co. / Marubeni Corp.

Industries

Utilities

Tags

Power & Water, Pipeline Crossing, Utilities